State of KY Planroom

HeaderHeader

RFB-31-23 KYTC - Hopkins County Maintenance Garage - Construction

Order

RFB-31-23 KYTC - Hopkins County Maintenance Garage - Construction

Contact

Company Contact

Division of Engineering and Contract Administration
Kyla Satterly
Location

Location

Madisonville, KY

Pre-Bid Information

Pre-Bid Information

Bid Information

Bid Information

12/19/2022 10:30 AM ET
Site Visit Information

Site Visit Information

December 05, 2022 11:00 A.M., Eastern Time Hopkins County Maintenance Garage, 2825 Nebo Rd., Madisonville, KY

Description

Description

Estimate: $391,900.00

Estimated Length of Project: 150 (Substantial Completion) + 30 (Final Completion)

The project is to convert an existing building to a maintenance garage for the Kentucky Transportation Cabinet, District 2. The existing building is a 21,000 square feet pre-engineered metal building with metal wall and roof panels and vinyl-faced roof and wall insulation. The existing structural system consists of a pre-engineered steel frame skeleton with conventional poured in place concrete shallow foundations, piers, grade beams and concrete floor slabs. The existing PEMB structure will be modified by the removal of an existing interior steel column and the addition of new framing and foundations to support the existing structure. The renovation work will provide new toilets, a shower room and mechanical room. Interior partitions will be light gauge steel framing with gypsum board surface and sound batt insulation. Pedestrian doors will be hollow metal. Overhead sectional doors are existing, to remain. The remainder of the building will be shop area. Site work consists of cutting and patching existing surfaces for installation of underground utilities. Site furnishings include flagpole. Water service is existing from municipal system, sanitary will gravity flow to municipal system. Existing plumbing fixtures will be demolished, and new plumbing will be installed in the renovated area. The building will utilize existing natural gas for heat. Ventilation will be restroom exhaust. Shop area will be heated with existing units and ventilated with existing exhaust fans. Existing electric service is to remain. Electrical work in the renovated area includes a 120/240V power distribution system and LED lighting. The existing automatic sprinkler system will be retained and modified as needed in the renovated area.

Job Purchase Information:

Free downloads are available by clicking “Order/Download” above. All downloads are typically available immediately in “My Downloads”. Download to your computer and print at any time. Full size hard copy sets are also available for a purchase and can be paid for by using a credit card online or your established Lynn account. Shipping, if required is additional based on the method selected.

Existing plan holders will be notified by email upon the release of any addenda and links will be available below for downloading/viewing.  Failure to order bid sets through Lynn Imaging and not being on the plan holders list will prevent you from receiving the notification and being able to view the addenda.